Early access — content in review
Free checklist

Courses / Reference

Transaction reference

80 plant maintenance transactions in process order, with what each does, where it fits in the course, and its source. Press Ctrl K to search everything.

80 transactions

CodeNameProcess stepDisciplineModuleStatus
IL01Create Functional LocationCreate plant hierarchy node (unit, system, tag location)1 Master dataBothM2 SAP PM foundations Sourced
IL02Change Functional LocationEdit functional location master1 Master dataBothM2 Sourced
IL03Display Functional LocationView functional location master1 Master dataBothM2 Sourced
IH01Functional Location StructureDisplay FL hierarchy with installed equipment1 Master data / 13 HistoryBothM2 / M12 Sourced
IE01Create EquipmentCreate equipment record (pump, motor, transmitter)1 Master dataBothM2 Sourced
IE02Change EquipmentEdit equipment master1 Master dataBothM2 Sourced
IE03Display EquipmentView equipment master1 Master dataBothM2 Sourced
IE4NEquipment Installation and DismantlingInstall/dismantle equipment at FL with goods movement (e.g., pump swap)1 Master data / 11 ExecutionMechanicalM5 Sourced
IB01Create Equipment BOMSpare-parts structure for equipment (seal, bearings)1 Master dataBothM2 / M3 Sourced
IB11Create Functional Location BOMSpare-parts structure for a FL1 Master dataBothM2 Sourced
IK01Create Measuring PointDefine reading point (vibration, bearing temp, run hours counter, as-found error)1 Master dataBothM2 / M5 / M6 Sourced
IK02Change Measuring PointEdit measuring point/counter1 Master dataBothM2 Sourced
IK03Display Measuring PointView measuring point/counter1 Master dataBothM2 Sourced
CL20NObject ClassificationAssign class/characteristics (e.g., range, SIL) to equipment1 Master dataBothM2 Check
IR01Create Work CenterCreate craft work center (mech, instrument, electrical) with capacity1 Master dataBothM2 / M8 Sourced
IR02Change Work CenterEdit work center1 Master dataBothM2 / M8 Sourced
IR03Display Work CenterView work center1 Master dataBothM2 Sourced
IP11Create/Change Maintenance StrategiesDefine strategy and packages (1M, 3M, 12M)2 StrategyMechanicalM4 Sourced
IP12Display Maintenance StrategiesView strategy2 StrategyMechanicalM4 Sourced
IA05Create General Maintenance Task ListReusable task list for a class of equipment3 Task listsBothM4 Sourced
IA06Change General Maintenance Task ListEdit general task list3 Task listsBothM4 Sourced
IA01Create Equipment Task ListTask list tied to one equipment3 Task listsBothM4 Sourced
IA11Create Functional Location Task ListTask list tied to one FL3 Task listsBothM4 Sourced
IA09Display Task ListsList/display task lists3 Task listsBothM4 Sourced
IP41Create Single-Cycle PlanFixed-interval plan (e.g., transmitter calibration)4 Maintenance plansI&EM4 / M6 Sourced
IP42Create Strategy PlanStrategy-based plan (e.g., pump packages)4 Maintenance plansMechanicalM4 / M5 Sourced
IP43Create Multiple Counter PlanPlan driven by counters/time combined (e.g., run hours)4 Maintenance plansMechanicalM4 / M5 Sourced
IP01Create Maintenance PlanClassic plan creation4 Maintenance plansBothM4 Sourced
IP15Change Maintenance Plan (list)Maintenance plan list editing - change4 Maintenance plansBothM4 Sourced
IP10Schedule Maintenance PlanStart/schedule a single plan; create call objects5 Scheduling plansBothM4 Sourced
IP30Deadline MonitoringLegacy mass scheduling, usually daily background job (program RISTRA20)5 Scheduling plansBothM4 Sourced
IP30HMass Schedule Maintenance PlansNewer mass scheduling5 Scheduling plansBothM4 Sourced
IP19Scheduling Overview and SimulationGraphical overview / simulation of plan dates5 Scheduling plansBothM4 Sourced
IP24Scheduling Overview List DisplayList of plan dates/calls5 Scheduling plansBothM4 Sourced
IW21Create PM Notification - GeneralRecord problem/request (e.g., high vibration found on route)6 NotificationsBothM2 Sourced
IW22Change PM NotificationEdit notification6 NotificationsBothM2 Sourced
IW23Display PM NotificationView notification6 NotificationsBothM2 Sourced
IW28Change Notifications (list)Notification list - change6 NotificationsBothM2 / M9 Sourced
IW29Display Notifications (list)Notification list - display6 NotificationsBothM2 / M9 Sourced
IW31Create OrderCreate maintenance order7 OrdersBothM3 Sourced
IW32Change OrderEdit order: operations, components, release, TECO, settlement rule7 Orders / 12 TECOBothM3 / M12 Sourced
IW33Display PM OrderView order7 OrdersBothM3 Sourced
IW38Change PM Orders (list)Order list - change7 OrdersBothM8 / M9 Sourced
IW39Display PM Orders (list)Order list - display7 Orders / 13 ReportingBothM8 / M9 Sourced
IW37NChange Orders and OperationsOrder and operation list - used for weekly schedule building7 Orders / 10 SchedulingBothM8 Sourced
MMBEStock OverviewCheck spare-part stock before release8 MaterialsBothM3 Sourced
MB52Warehouse Stocks of MaterialStock list by plant/storage location8 MaterialsBothM3 Sourced
MIGOGoods MovementGoods issue to order (mvt 261), return (262)8 MaterialsBothM3 / M12 Sourced
ME51NCreate Purchase RequisitionManual PR for non-stock/external needs8 MaterialsBothM3 Sourced
IPMDMaintain/Display PermitsCreate/change technical permits (classic PM permits)9 PermitsBothM10 Check
IPM2Change PermitChange permit (permits can also be issued from IW32)9 PermitsBothM10 Check
IPM3Display PermitDisplay permit9 PermitsBothM10 Check
WCTAWCM: Create WAP (Work Approval)Create work approval9 PermitsBothM10 Check
WCTKWCM: Create WCA (Work Clearance Application)Create safety certificate / LOTO application9 PermitsBothM10 Check
WCTLWCM: Change WCAChange work clearance application9 PermitsBothM10 Check
WCTMWCM: Display WCADisplay work clearance application9 PermitsBothM10 Check
WCT6WCM: Create Operational WCDCreate lockout/tagout document9 PermitsBothM10 Check
WCT7WCM: Change Operational WCDChange lockout/tagout document9 PermitsBothM10 Check
WCT8WCM: Display Operational WCDDisplay lockout/tagout document9 PermitsBothM10 Check
WCL9WCM: Change Work Approvals (list)Work approval list - change9 PermitsBothM10 Check
WCLAWCM: Display Work Approvals (list)Work approval list - display9 PermitsBothM10 Check
WCLOWCM: Change Work PermitsChange work permits9 PermitsBothM10 Check
WCLPWCM: Display Work PermitsDisplay work permits9 PermitsBothM10 Check
PTWMASSGENMass Generation of Permit to Work ObjectsGenerate work permits/safety certificates for orders from templates9 PermitsBothM10 Sourced
F6579 (Fiori)Manage Work PermitsPermit to Work: request, approve, print permits and safety certificates9 PermitsBothM10 Sourced
IK11Create Measurement DocumentEnter reading (vibration, counter, as-found/as-left)10 MeasurementsBothM5 / M6 Sourced
IK17Display Measurement Documents (list)Trend/review readings10 Measurements / 13 HistoryBothM5 / M6 / M12 Sourced
CM01Capacity Evaluation - Work Center LoadRequired vs available capacity per work center10 Scheduling/capacityBothM8 Sourced
CM25Capacity Leveling - VariableTabular planning board to level operations against capacity10 Scheduling/capacityBothM8 Sourced
IW41Individual Time ConfirmationConfirm hours/operation completion11 ConfirmationBothM8 / M12 Sourced
IW42Overall Completion ConfirmationTime, materials, measurements, technical findings in one screen11 ConfirmationBothM12 Sourced
IW44Collective Time Confirmation Without SelectionMass time entry11 ConfirmationBothM12 Sourced
IW48Collective Time Confirmation With SelectionMass time entry with order selection11 ConfirmationBothM12 Sourced
IW47Confirmation ListDisplay time confirmations11 Confirmation / 13 ReportingBothM9 / M12 Sourced
KO88Actual Settlement: OrderSettle order costs to receiver12 TECO/closeBothM12 Check
MCI1PMIS: Object Class AnalysisOrders/notifications/costs by object class13 History/reportingBothM12 Sourced
MCI5PMIS: Object Damage AnalysisDamage/cause analysis13 History/reportingBothM12 Sourced
MCI7PMIS: Breakdown AnalysisBreakdowns, MTTR/MTBR inputs13 History/reportingBothM12 Sourced
MCI8PMIS: Cost AnalysisMaintenance cost evaluation13 History/reportingBothM12 Sourced
MCJBMTTR/MTBR for EquipmentReliability metrics per equipment13 History/reportingMechanicalM12 Sourced

Esc to close · powered by a static index