Courses / Reference
Transaction reference
80 plant maintenance transactions in process order, with what each does, where it fits in the course, and its source. Press Ctrl K to search everything.
80 transactions
| Code | Name | Process step | Discipline | Module | Status |
|---|---|---|---|---|---|
IL01 | Create Functional LocationCreate plant hierarchy node (unit, system, tag location) | 1 Master data | Both | M2 SAP PM foundations | Sourced |
IL02 | Change Functional LocationEdit functional location master | 1 Master data | Both | M2 | Sourced |
IL03 | Display Functional LocationView functional location master | 1 Master data | Both | M2 | Sourced |
IH01 | Functional Location StructureDisplay FL hierarchy with installed equipment | 1 Master data / 13 History | Both | M2 / M12 | Sourced |
IE01 | Create EquipmentCreate equipment record (pump, motor, transmitter) | 1 Master data | Both | M2 | Sourced |
IE02 | Change EquipmentEdit equipment master | 1 Master data | Both | M2 | Sourced |
IE03 | Display EquipmentView equipment master | 1 Master data | Both | M2 | Sourced |
IE4N | Equipment Installation and DismantlingInstall/dismantle equipment at FL with goods movement (e.g., pump swap) | 1 Master data / 11 Execution | Mechanical | M5 | Sourced |
IB01 | Create Equipment BOMSpare-parts structure for equipment (seal, bearings) | 1 Master data | Both | M2 / M3 | Sourced |
IB11 | Create Functional Location BOMSpare-parts structure for a FL | 1 Master data | Both | M2 | Sourced |
IK01 | Create Measuring PointDefine reading point (vibration, bearing temp, run hours counter, as-found error) | 1 Master data | Both | M2 / M5 / M6 | Sourced |
IK02 | Change Measuring PointEdit measuring point/counter | 1 Master data | Both | M2 | Sourced |
IK03 | Display Measuring PointView measuring point/counter | 1 Master data | Both | M2 | Sourced |
CL20N | Object ClassificationAssign class/characteristics (e.g., range, SIL) to equipment | 1 Master data | Both | M2 | Check |
IR01 | Create Work CenterCreate craft work center (mech, instrument, electrical) with capacity | 1 Master data | Both | M2 / M8 | Sourced |
IR02 | Change Work CenterEdit work center | 1 Master data | Both | M2 / M8 | Sourced |
IR03 | Display Work CenterView work center | 1 Master data | Both | M2 | Sourced |
IP11 | Create/Change Maintenance StrategiesDefine strategy and packages (1M, 3M, 12M) | 2 Strategy | Mechanical | M4 | Sourced |
IP12 | Display Maintenance StrategiesView strategy | 2 Strategy | Mechanical | M4 | Sourced |
IA05 | Create General Maintenance Task ListReusable task list for a class of equipment | 3 Task lists | Both | M4 | Sourced |
IA06 | Change General Maintenance Task ListEdit general task list | 3 Task lists | Both | M4 | Sourced |
IA01 | Create Equipment Task ListTask list tied to one equipment | 3 Task lists | Both | M4 | Sourced |
IA11 | Create Functional Location Task ListTask list tied to one FL | 3 Task lists | Both | M4 | Sourced |
IA09 | Display Task ListsList/display task lists | 3 Task lists | Both | M4 | Sourced |
IP41 | Create Single-Cycle PlanFixed-interval plan (e.g., transmitter calibration) | 4 Maintenance plans | I&E | M4 / M6 | Sourced |
IP42 | Create Strategy PlanStrategy-based plan (e.g., pump packages) | 4 Maintenance plans | Mechanical | M4 / M5 | Sourced |
IP43 | Create Multiple Counter PlanPlan driven by counters/time combined (e.g., run hours) | 4 Maintenance plans | Mechanical | M4 / M5 | Sourced |
IP01 | Create Maintenance PlanClassic plan creation | 4 Maintenance plans | Both | M4 | Sourced |
IP15 | Change Maintenance Plan (list)Maintenance plan list editing - change | 4 Maintenance plans | Both | M4 | Sourced |
IP10 | Schedule Maintenance PlanStart/schedule a single plan; create call objects | 5 Scheduling plans | Both | M4 | Sourced |
IP30 | Deadline MonitoringLegacy mass scheduling, usually daily background job (program RISTRA20) | 5 Scheduling plans | Both | M4 | Sourced |
IP30H | Mass Schedule Maintenance PlansNewer mass scheduling | 5 Scheduling plans | Both | M4 | Sourced |
IP19 | Scheduling Overview and SimulationGraphical overview / simulation of plan dates | 5 Scheduling plans | Both | M4 | Sourced |
IP24 | Scheduling Overview List DisplayList of plan dates/calls | 5 Scheduling plans | Both | M4 | Sourced |
IW21 | Create PM Notification - GeneralRecord problem/request (e.g., high vibration found on route) | 6 Notifications | Both | M2 | Sourced |
IW22 | Change PM NotificationEdit notification | 6 Notifications | Both | M2 | Sourced |
IW23 | Display PM NotificationView notification | 6 Notifications | Both | M2 | Sourced |
IW28 | Change Notifications (list)Notification list - change | 6 Notifications | Both | M2 / M9 | Sourced |
IW29 | Display Notifications (list)Notification list - display | 6 Notifications | Both | M2 / M9 | Sourced |
IW31 | Create OrderCreate maintenance order | 7 Orders | Both | M3 | Sourced |
IW32 | Change OrderEdit order: operations, components, release, TECO, settlement rule | 7 Orders / 12 TECO | Both | M3 / M12 | Sourced |
IW33 | Display PM OrderView order | 7 Orders | Both | M3 | Sourced |
IW38 | Change PM Orders (list)Order list - change | 7 Orders | Both | M8 / M9 | Sourced |
IW39 | Display PM Orders (list)Order list - display | 7 Orders / 13 Reporting | Both | M8 / M9 | Sourced |
IW37N | Change Orders and OperationsOrder and operation list - used for weekly schedule building | 7 Orders / 10 Scheduling | Both | M8 | Sourced |
MMBE | Stock OverviewCheck spare-part stock before release | 8 Materials | Both | M3 | Sourced |
MB52 | Warehouse Stocks of MaterialStock list by plant/storage location | 8 Materials | Both | M3 | Sourced |
MIGO | Goods MovementGoods issue to order (mvt 261), return (262) | 8 Materials | Both | M3 / M12 | Sourced |
ME51N | Create Purchase RequisitionManual PR for non-stock/external needs | 8 Materials | Both | M3 | Sourced |
IPMD | Maintain/Display PermitsCreate/change technical permits (classic PM permits) | 9 Permits | Both | M10 | Check |
IPM2 | Change PermitChange permit (permits can also be issued from IW32) | 9 Permits | Both | M10 | Check |
IPM3 | Display PermitDisplay permit | 9 Permits | Both | M10 | Check |
WCTA | WCM: Create WAP (Work Approval)Create work approval | 9 Permits | Both | M10 | Check |
WCTK | WCM: Create WCA (Work Clearance Application)Create safety certificate / LOTO application | 9 Permits | Both | M10 | Check |
WCTL | WCM: Change WCAChange work clearance application | 9 Permits | Both | M10 | Check |
WCTM | WCM: Display WCADisplay work clearance application | 9 Permits | Both | M10 | Check |
WCT6 | WCM: Create Operational WCDCreate lockout/tagout document | 9 Permits | Both | M10 | Check |
WCT7 | WCM: Change Operational WCDChange lockout/tagout document | 9 Permits | Both | M10 | Check |
WCT8 | WCM: Display Operational WCDDisplay lockout/tagout document | 9 Permits | Both | M10 | Check |
WCL9 | WCM: Change Work Approvals (list)Work approval list - change | 9 Permits | Both | M10 | Check |
WCLA | WCM: Display Work Approvals (list)Work approval list - display | 9 Permits | Both | M10 | Check |
WCLO | WCM: Change Work PermitsChange work permits | 9 Permits | Both | M10 | Check |
WCLP | WCM: Display Work PermitsDisplay work permits | 9 Permits | Both | M10 | Check |
PTWMASSGEN | Mass Generation of Permit to Work ObjectsGenerate work permits/safety certificates for orders from templates | 9 Permits | Both | M10 | Sourced |
F6579 (Fiori) | Manage Work PermitsPermit to Work: request, approve, print permits and safety certificates | 9 Permits | Both | M10 | Sourced |
IK11 | Create Measurement DocumentEnter reading (vibration, counter, as-found/as-left) | 10 Measurements | Both | M5 / M6 | Sourced |
IK17 | Display Measurement Documents (list)Trend/review readings | 10 Measurements / 13 History | Both | M5 / M6 / M12 | Sourced |
CM01 | Capacity Evaluation - Work Center LoadRequired vs available capacity per work center | 10 Scheduling/capacity | Both | M8 | Sourced |
CM25 | Capacity Leveling - VariableTabular planning board to level operations against capacity | 10 Scheduling/capacity | Both | M8 | Sourced |
IW41 | Individual Time ConfirmationConfirm hours/operation completion | 11 Confirmation | Both | M8 / M12 | Sourced |
IW42 | Overall Completion ConfirmationTime, materials, measurements, technical findings in one screen | 11 Confirmation | Both | M12 | Sourced |
IW44 | Collective Time Confirmation Without SelectionMass time entry | 11 Confirmation | Both | M12 | Sourced |
IW48 | Collective Time Confirmation With SelectionMass time entry with order selection | 11 Confirmation | Both | M12 | Sourced |
IW47 | Confirmation ListDisplay time confirmations | 11 Confirmation / 13 Reporting | Both | M9 / M12 | Sourced |
KO88 | Actual Settlement: OrderSettle order costs to receiver | 12 TECO/close | Both | M12 | Check |
MCI1 | PMIS: Object Class AnalysisOrders/notifications/costs by object class | 13 History/reporting | Both | M12 | Sourced |
MCI5 | PMIS: Object Damage AnalysisDamage/cause analysis | 13 History/reporting | Both | M12 | Sourced |
MCI7 | PMIS: Breakdown AnalysisBreakdowns, MTTR/MTBR inputs | 13 History/reporting | Both | M12 | Sourced |
MCI8 | PMIS: Cost AnalysisMaintenance cost evaluation | 13 History/reporting | Both | M12 | Sourced |
MCJB | MTTR/MTBR for EquipmentReliability metrics per equipment | 13 History/reporting | Mechanical | M12 | Sourced |