Drawings / Instrumentation legend

Instrumentation symbol legend

Bubble shapes and tag letters in the style commonly taught from ISA 5.1 ideas, written here in our own words for planners. Confirm every convention against your site legend.

Bubble shapes

FT 1001 Field mounted Circle FIC 1001 Panel / console Circle with bar FIC 1001 DCS / shared Square UY 1501 PLC / discrete Diamond FY Computer fn Hexagon A horizontal line through a circle often means the device is accessible from a main panel or board. Dashed outer rings (not shown) can mean inaccessible or behind the panel. Follow your site legend.

Tag letter table (teaching)

First letter is the measured variable. Succeeding letters are the function. Loop number ties devices together.

LettersMeaning (teaching)Example
FFlowFT, FIC, FV
LLevelLT, LIC, LSHH
PPressurePT, PIC, PSV
TTemperatureTE, TT, TIC
I (succeeding)IndicateFI, LI, PI
C (succeeding)ControlFIC, LIC
T (succeeding)TransmitFT, LT, PT
S / H / LSwitch / high / lowLSHH, PSL
YRelay / compute / convertFY I/P, UY logic
VValve / damper / final elementFV, LV, UV
ESensor / primary elementTE thermocouple
HSHand switchHS-1401

This table is a planner cheat sheet, not a full standard reprint. Site legend and ISA publications govern formal work.

Signal lines

Electric / electronic signal Pneumatic (hash marks) Data link / software Capillary (filled circles) Process connection (solid)

Esc to close · powered by a static index